Site location:

Devanahalli, Bangalore

Project type:

Labour Camp

Capacity (KLD):

150

Built up area (m²):

101

Built up volume (m³):

150

Construction period (days):

15

Start of operation:

Nov 24

PROJECT BACKGROUND

SYSTEM IN BRIEF

The wastewater streams are collected in a baffled raw sewage collection tank from where it is pumped to an overhead Buffer Tank for providing a constant gravity flow of raw sewage feed to the rejuWATER® modules. The outlet (treated water) from the bottom of the modules is then used directly or polished further, depending on the use case.

PURPOSE

  • Compliance with State Pollution Control Board standards

  • To treat large quantity of wastewater generated

  • To supplement the water requirements

drg_ga_bf.jpeg

OPERATION & MAINTENANCE

The wastewater treatment plant is operated and maintained by the trained gardener of the premises. A regular daily schedule is followed for maintenance, like checking of sewer line systems, removal of sludge from modules (if any) and regular harvesting of plants. 

​

Cost incurred per month for operation and maintenance is approximately ₹25,000/-

REUSE OPTIONS

  • Influent quality : BOD: 300 to 600 mg/L, COD: 600 to 800 mg/L.

  • Reuse of treated water for gardening and horticulture.

  • Sludge can be transformed into good manure through composting.